Dijkstra's: STEP 2 Base Network Prior [Step 1] Next [Step 3] Final Step

Step 2. Node 2 is added (permanently labeled) to the MP tree. Outbound links from node 2 include links to nodes 3 and 6; the corresponding temporary labels are updated and predecessor nodes are set to node 2.
Last Updated: 14 July 2008 / ©mgm