Dijkstra's: STEP 3 | Base Network | Prior [Step 2] | Next [Step 4] | Final Step |
Step 3. Node 7 is added (permanently labeled) to the MP tree. Outbound links from node 7 include links to nodes 8 and 13; the temporary labels are updated. The link from 6 to 12 is still under consideration. |